Hampshire · Heat pump installation

Heat pump installation in Palestine, Hampshire

For MCS certified installation of air source heat pumps for heating and hot water, with the Boiler Upgrade Scheme grant applied for in Palestine, one call is all it takes: diagnosis, fixed price, work and sign-off. F-Gas certified, NICEIC approved and Checkatrade members.

  • Deciding on the outdoor unit position
  • A boiler that’s getting old
  • Working out where a cylinder could go

Air source heat pumps across Palestine

Air source heat pumps in Palestine

Air source heat pumps collect heat from outdoor air and bring it inside, using electricity to drive the process. It works on the same principle as air conditioning, run the other way, and air-to-air heat pumps are sometimes simply called air conditioning. If the problem is questions about the Boiler Upgrade Scheme and no space for a hot water cylinder, we can sort it out.

For a home around Palestine that is off mains gas and heated by oil or LPG, the Boiler Upgrade Scheme adds an extra £1,500 until March 2027 for an air source or ground source heat pump, on top of the £7,500.

Whatever the visit, you get a written record: commissioning details and F-Gas records for a new system, a note of the fault and the fix for a repair, or a service record. Keep it with the system’s paperwork so it’s to hand next time.

Location
Palestine (SP11)
Wider area
Hampshire
Price
Fixed-price quote after a site survey
Certified
F-Gas certified, NICEIC approved, MCS
Typical price
Air-to-water £8,000–£16,000 before any grant (0% VAT for homes)
Call
07833 053749
Last updated
30 October 2026

Landlords, agents and facilities managers

We regularly work with managing agents. Tell us the property, the work and the access arrangements, and we’ll send a fixed-price quote.

When the building owner and the occupier are different, the lease or tenancy agreement normally sets out who maintains what. We can quote either party, and the paperwork can go to both.

Homes in Palestine and heat pumps

About 81% of households live in detached or semi-detached houses, according to the last census (2021). Detached and semi-detached houses usually have room for the outdoor unit and a cylinder. At about 70 miles from central London, Palestine sits inside the area we cover across London and the South East.

Older homes near Church of St Leonard may need extra checks for planning and heat loss before a heat pump is designed. Homeowners near Grateley station often ask whether a heat pump can take over from the boiler, and the heat loss survey answers that.

Palestine is in Hampshire. Homes and businesses alike in Palestine, our engineers can help with air source heat pumps. You’ll hear back from us the same working day, and there’s a 24/7 emergency line. 683 places in Hampshire are on our list, large and small. We also work in Guildford, about 46 miles from Palestine.

Our engineers cover all of SP11 for air source heat pumps. Our engineers work on Station Road, Streetway Road and Campbell Close and nearby roads. Close to Palestine, our area also takes in Grateley (1 mile north-east), Quarley (2 miles north), Over Wallop (2 miles south-east), Fox (2 miles north-east) and Kentsboro (3 miles east). Further out, we also cover Winchester (15 miles south-east), Andover (7 miles north-east), Romsey (14 miles south-east) and Hyde (15 miles south-east).

What’s near Palestine

There’s a railway station in Palestine itself: Grateley station. Open spaces near Palestine include Quarley Hill and Winterbourne Downs RSPB reserve.

Map of Palestine © OpenStreetMap contributors

System by system

Air-to-water heat pumps

Air-to-water systems take heat from the air and put it into your central heating and hot water. It takes over from the boiler, and is MCS certified when we install it.

Air-to-air heat pumps

Air-to-air heat pumps warm rooms through indoor units and can cool them in summer. Hot water needs a separate source so you’ll need another way to heat it.

What happens on the day

We book the visit for a day and time that suit you, and we keep you posted if anything changes. When we arrive, we check the job against the survey or the pictures you sent. Anything unexpected is raised with you before we go further. After that, it takes several days for an air-to-water system with a new cylinder, less for an air-to-air system. A note on how to find the property and where to park makes a visit to Palestine easier.

  1. We start with your plans and the property.
  2. The survey checks heat loss, emitters, hot water and the outdoor unit position.
  3. You get our view on the right type for the house, and on whether the Boiler Upgrade Scheme applies.
  4. The system is installed and connected to the controls.
  5. We commission it, complete the MCS certificate and show you how to use it.

Preparing for the visit

  • Plan for pets to be kept clear during the visit
  • Tell us about any building rules, permits or sign-in
  • Clear a path to the units and the space around them

Get a fixed-price quote

Every quote starts with a look at the job, either on a site survey or, for simple jobs, from your pictures and details. After that, we send a fixed price before any work starts.

Get a quick quote

Advice

Safe owner checks

Before you call us about a fault, a few checks can save a visit: check the mode, the set temperature, the remote’s batteries and the breaker. If the breaker trips a second time, leave it off and ring us on 07833 053749 or drop us a line.

For air conditioning, cleaning the indoor unit’s filters is the main job owners can do where the manufacturer’s manual explains how. They come out, get a gentle clean and go back only when they’re dry. On a heat pump, the equivalent is keeping the outdoor unit clear and checking the controls.

FAQs for Palestine

Does the Boiler Upgrade Scheme cover homes in Palestine?

Yes, the scheme covers homes in England, including Palestine, if they qualify. The amount depends on the type of heat pump, and the survey confirms which applies. We hold MCS certification, so the application is ours to make for you.

Will you come out to Palestine?

Yes, smaller places are covered as well as towns. Visits to smaller places are planned so the engineer arrives with what the job needs.

How long will it take to install a heat pump?

Expect it to take anything from a couple of days for air-to-air to the best part of a week for air-to-water with radiator changes. How much of the heating changes decides most of the time, and we confirm the timing with your quote.

What’s the difference between air-to-water and air-to-air heat pumps?

Air-to-water heats radiators or underfloor heating and hot water; air-to-air heats rooms through indoor units and can cool them. Air-to-air does not heat hot water and the survey helps decide.

Can I do the refrigerant work myself?

No, not the refrigerant side. Under the F-gas rules, it must be done by qualified engineers from a certified company, and a new electrical circuit is notifiable building work unless a registered competent person does it.

What does an air-to-water heat pump cost?

Air-to-water systems are £8,000–£16,000 (0% VAT on homes), before any grant. The final price depends on the heat loss survey, the radiators and the cylinder, and you get a fixed-price quote.

How quickly will you reply?

You’ll hear from us the same working day. If it’s an emergency, ring the 24/7 line instead.

A customer’s words

“Office air con broke down in the July heatwave. Called at 8am, engineer was here by noon and fixed within 2 hours. Brilliant emergency response. They now hold the service contract for the whole building.”

James T., Crawley, office manager

F-Gas certified companyRefrigerant work done and recorded properly
NICEIC approvedElectrical work certified
MCS certifiedHeat pump installations
Checkatrade memberVetted trade directory
24/7 emergency lineBased in East Grinstead